VCS Methodology Element Double Approval Process History

The table below provides a record of all VCS methodology elements which have undergone double approval and received a decision of approved or not approved and those methodologies which have been withdrawn from the double approval process. Methodology elements which have been approved are assigned a VCS methodology element reference number and posted as an approved VCS methodology element on the Approved VCS Methodology Elements page. Those methodology elements that have not been approved remain in the status not approved unless they are amended, resubmitted and subsequently approved.

Developer Name Sectoral Scope1 Status
Camco International Limited New Cogeneration Facilities Supplying Less Carbon Intensive Electricity to Grid and Steam and/or Hot Water to one or more Grid Customers 1 Approved
Climate Solutions Group, LLC Revisions to Approved Baseline and Monitoring Methodology AM0047 and Tool to Calculate the Emission Factor for a Petroleum Distribution System 1, 5 Withdrawn
CN Business Network VM0001 Infrared Automatic Refrigerant Leak Detection Efficiency Project Methodology, v1.0 11 Approved
Ecotrust Improved Forest Management through Extension of Rotation Age 14 Approved
Infinite Earth, Ltd. Baseline and monitoring methodology for conservation projects that avoid planned land use conversion in peat swamp forests 14 Approved
Ruby Canyon Engineering VMR0001 Revisions to ACM0008 to Include Pre-drainage of Methane from an Active Open Cast Mine as a Methane Emission Reduction Activity 8, 9 Approved
Vessels Coal Gas, Inc. Revisions to ACM0008 to Include Methane Capture and Destruction from Abandoned Coal Mines 8, 10 Approved

1A list of VCS sectoral scopes is available at the following page: VCS Sectoral Scopes